CONCEPT Redesign proposal by Studio Vektor for GCM Medical & OEM. Not the official GCM site. Figures marked Sample are placeholders pending GCM verification.

00 Precision manufacturing partner

Precision you can inspect before you send a print.

Since 1978, GCM has machined, welded and assembled critical components for surgical robotics, medical device, genomics and aerospace OEMs, across four sites in the US and Asia.

  • 1978 Founded
  • 4 Manufacturing sites
  • ~300 People
  • ISO 13485 · AS9100 Quality systems Verify
Ø 6.000 ±0.0001 6× M3 ⌖ Ø0.01 Ⓜ A B Ø 44.450 ±0.005 Ra 0.4 ARTIC. HOUSING · Ti-6Al-4V REV C · SCALE 2:1 · SAMPLE
X 0000.000Y 0000.000

01 Industries

Built for programs where a part failing is not an option.

  • A

    Surgical robotics

    Articulation joints, instrument drives, wrist housings with stacked micro-tolerances.

  • B

    Medical devices

    Implant-adjacent and delivery components, cleanroom-assembled and documented.

  • C

    Genomics & life science

    Instrument stages, fluidic manifolds and precision motion components.

  • D

    Aerospace

    Fluid manifolds, brackets and welded assemblies with full traceability.

  • E

    Critical industrial

    Semiconductor and automation components where uptime depends on fit.

02 Engineering & Capabilities

Capabilities matrix

Filter by industry to see which processes apply, the representative spec, and where it's run. Share a filtered view: the URL updates as you filter.

Sample Specs are representative placeholders pending GCM verification.

P-01

5-axis milling

Complex prismatic and organic geometry in one setup: housings, manifolds, implant-grade features.

Materials
Ti, 17-4 PH, 316L, Al, PEEK
Volume
Proto → production
See it on a part

P-02

Swiss turning

Long, slender, high-volume turned parts with live tooling: shafts, pins, instrument components.

Materials
Ti, 300/400 SS, Nitinol, Co-Cr
Volume
1k → 1M+ / yr
See machines

P-03

Wire & sinker EDM

Sharp internal corners, thin walls and hardened materials without cutting forces.

Materials
Hardened tool steel, carbide, Ti
Volume
Proto → mid
See machines

P-04

Robotic welding

Repeatable laser and TIG welding in fixtured robotic cells with documented weld parameters.

Materials
SS, Ti, Inconel, Al
Volume
Pilot → production
Watch the bead

P-05

Cleanroom assembly

Sub-assembly, cleaning, packaging and labeling in classified cleanrooms, with build records.

Output
Tested sub-assemblies
Records
DHR inputs, traveler
Cleanroom validation

P-06

Metrology & inspection

CMM, optical and vision measurement, first article inspection and capability studies.

Methods
CMM, optical, CT on request
Reports
FAI, Cpk, PPAP
Walk the audit

P-07

Finishing & passivation

Passivation, electropolish, anodize, bead blast and laser marking for UDI.

Finishes
Passivate, EP, Type II/III
Marking
Laser UDI
Compare finishes

P-08

DFM & engineering

Tolerance-stack review, material selection and cost-down redesign before the first chip.

Deliverable
DFM report, redlines
Stage
Concept → transfer
Request a DFM review

03 3D component viewer

Take the joint apart.

A surgical-robot articulation joint, rendered live. Orbit it, explode it, cut it open, and select a part to read its tolerance, material and inspection method.

Sample Demonstrator geometry. Not a customer part.

Drag to orbit · Scroll to zoom

04 End-to-end process

One partner from DFM to a tested sub-assembly.

  1. 01

    DFM & engineering support

    Tolerance stack review, material selection and redesign for cost and manufacturability.

    Hands off → Approved drawing + DFM report

    • DFM report
    • Drawing rev approval
    • Risk assessment input
  2. 02

    Sourcing

    Qualified mill sources with certs traceable to heat and lot, kitted per work order.

    Hands off → Certified, traceable material

    • Mill certs
    • Incoming inspection
    • Lot traceability
  3. 03

    Precision machining

    Multi-axis milling, Swiss turning and EDM with in-process SPC on critical features.

    Hands off → Machined parts within spec

    • Traveler
    • In-process SPC
    • Tool & program rev
  4. 04

    Robotic welding

    Fixtured laser and TIG cells running locked parameters for repeatable joints.

    Hands off → Welded, inspected assemblies

    • WPS / parameters
    • Weld inspection
    • Operator cert
  5. 05

    Cleanroom assembly

    Cleaning, sub-assembly, packaging and labeling in a classified cleanroom.

    Hands off → Clean, labeled sub-assemblies

    • Cleanroom log
    • Build record
    • Label / UDI
  6. 06

    Quality & testing

    First article, CMM, functional test and a complete documentation package.

    Hands off → Released product + data pack

    • FAI report
    • CoC
    • DHR inputs

05 Robotic welding

Scroll to lay the bead.

A laser seam on a 316L manifold, scrubbed by your scroll. Locked parameters mean the hundredth joint matches the first.

Process
Fiber laser, autogenous
Joint
Lap, 0.8 mm wall
Travel
0.0 mm
Inspection
Visual + leak test

Sample Illustrative parameters.

06 Quality, measured

Numbers the quality team signs.

Sample Illustrative values. Replaced with verified, dated figures at launch.

0.00

Cpk on critical features

Target · as of —

0.0%

First-pass yield

Trailing 12 mo · as of —

0.0%

On-time delivery

Trailing 12 mo · as of —

2000

Customer PPM

Lower is better · as of —

07 Facilities & equipment

Four sites. One quality system.

Select a site to see its role, then filter the equipment index by process, axes, envelope and automation.

Sample Equipment rows are placeholders for GCM's equipment register.

Equipment index
MachineProcessAxesEnvelope X×Y×Z (mm)AutomationSite

08 Supply Chain & Quality

Compliance center

Every certificate with its registrar, scope, sites covered and expiry, so supplier qualification starts with evidence instead of an email chain.

Verify Certificate details to be supplied by GCM Quality.

ISO 13485:2016

Pending verification

Medical devices quality management system.

Registrar
—
Cert no.
—
Sites
—
Expires
—
View certificate

AS9100D

Pending verification

Aerospace quality management system.

Registrar
—
Cert no.
—
Sites
—
Expires
—
View certificate

ISO 9001:2015

Pending verification

Quality management system, all industries.

Registrar
—
Cert no.
—
Sites
—
Expires
—
View certificate

ISO 14644-1 cleanroom

Pending verification

Class, area, last certification and monitoring regime per cleanroom.

Class
—
Area
—
Last cert.
—
Monitoring
Particles, ΔP
Validation summary

Walk the audit

Move through the quality system the way an auditor does.

Supplier qualification pack

Quality manual summary, org chart, insurance certificates and capability statement, in one download.

Request the pack

09 Case study

Wrist housing: from marginal to capable.

Sample Illustrative case. Replace with an approved GCM program.

Industry
Surgical robotics
Part
Wrist housing
Material
Ti-6Al-4V
Volume
4,000 / yr

Challenge

A bearing bore held ±0.0002" on paper, but the incumbent's process drifted with heat, and incoming inspection was rejecting lots.

Engineering solution

DFM moved the datum scheme to the bore, the part went to a single 5-axis setup with in-process probing, and a thermal warm-up cycle was locked into the program.

Outcome

Drag the slider to compare the process before and after.

Cpk1.00
Cycle time42 min
Setups3
Before After

10 Start a project

Scope it in six steps.

Tell us what you're building. Your files release to GCM engineering only after the mutual NDA is signed.

  • Encrypted upload, access-logged
  • NDA-first release
  • Engineering reply, not a sales autoresponder

Step 1 of 6

Industry & application
Project stage
Volumes & timing
Materials & requirements
Upload CAD & drawings

    Concept demo: files stay in your browser and are not uploaded.

    Contact & mutual NDA

    Mutual NDA preview

    This Mutual Non-Disclosure Agreement is between GCM Medical & OEM, Inc. and [your company], covering drawings, models and specifications shared for the purpose of quotation and engineering review.